Baldivis ERWWTP – Landscaping: Water Corporation

Water corporation logo

On 11th June 2014, Phase3 were awarded the rehabilitation landscape works in conjunction with the Water Corporation construction of a sewerage pipeline in Baldivis in the City of Rockingham. The works under contract will include all rehabilitation works required to ensure the POS is restored to pre-construction condition or better including:

  • Reinstatement of turf;
  • Reinstatement of trees;
  • Reinstatement of POS infrastructure; and
  • Reinstatement of irrigation infrastructure.

The works are scheduled to be completed between July and September 2014.